ROI Calculator
See what reactive maintenance is really costing you
Estimate how much your building or portfolio could save by reducing reactive maintenance, emergency callouts, downtime and inefficient infrastructure performance.
Your portfolio
Adjust to model your current operating costs.
Adjust assumptions
Annual savings
AED 697,900
Monthly
AED 58,158
ROI
429%
Payback
2.3 mo
Callout savings
AED 95,040
HVAC efficiency
AED 117,500
Admin time
AED 63,360
3-yr projection
AED 1,697,700
Operational Cost Comparison
Annual operating cost · AED
Projected Savings Over 5 Years
Cumulative net savings · AED
Savings Breakdown
Estimated annual savings · AED
Illustrative model based on your inputs and the assumptions above. Actual results vary by building, system condition and operating profile. Figures are an estimate, not a guarantee.
